李克强在全国住房保障工作会上强调-扎实做好明年保障性安居工程建设, 确保公开公正公平分配
12月22日,中共中央政治局常委、国务院副总理李克强在北京出席全国住房保障工作会并讲话。
北京12月22日,中共中央政治局常委、国务院副总理李克强在全国住房保障工作会上强调,要贯彻落实中央经济工作会议精神,扎实做好明年住房保障工作,在确保质量的前提下,统筹推进新开工和结转续建项目建设,完善配套设施,力争更多竣工,确保分配公平,促进民生改善和经济发展。
——专访住房城乡建设部政策研究中心主任秦虹
由上海市测绘院编制的,2012版上海地图,正式发布。其中,新版的《 大城区详图》覆盖范围,东起浦东国际机场、西至青浦嘉松公路、南临松江新城、北抵嘉定城区,总面积超过3000平方公里,比2011版交通图覆盖的1300平方公里,增加了1700平方公里,上海六大保障性住房基地,都在图上,得到了标示。
英语,英文,由谷歌自动翻译;谷歌英语;谷歌英文
转载人:From: http://www.billionairesParty.com http://www.billionairesGroup.com http://www.billionairesdesire.com http://www.helicoptersbuyers.com
英联邦 中餐馆经营管理综合集團公司董事局主席:Mr.George Chen = Mr.Geoorge S. Chen : 1779642876@qq.com ; george13901623260@163.com ; chensihong1961@126.com ; QQ: 1779642876 ;我自己的,只接受短信的手機(0086-13901623260); 我的一切生意夥伴,請與我的各個郵箱聯繫;潛在購買歐美品牌直升機者們,請你務必出具銀行資信證明書;如果購買者沒有RMB 3,999,999以上巨額存款證明書者,請勿打擾,謝謝 歐美名牌直升飛機購買者請填表:姓名,預算額,名片,單位網址,手機號碼,郵箱號碼,QQ號碼,用途,使用地點,飛行公里要求,有否直升機駕駛私照… http://1779642876.qzone.qq.com
Li Keqiang, the national housing and support was emphasized – a solid job in the construction of affordable housing projects next year, to ensure fair and equitable distribution of open
December 22, Hu Jintao, Vice Premier Li Keqiang in Beijing to attend the national housing and support meeting and delivered speeches.
Beijing December 22, Hu Jintao, Vice Premier Li Keqiang at the national housing and support stressed the need to implement the Central Economic Work Conference, a solid job next year housing guarantee work under the premise of ensuring quality, co-ordination promote the continued construction of new projects started and carried forward, improved facilities, more and strive to be completed to ensure fair distribution, promotion of people’s livelihood improvement and economic development.
At the meeting, Housing and Urban Affairs, Beijing, Heilongjiang, Jiangsu, Shaanxi, four provinces (municipalities) responsible comrade of the government housing security this year and next year work plan and recommendations. After carefully listening to their speeches, Li Keqiang said that this year, the work of housing support is very unusual year. All localities and departments work together to measure hard, forceful, active break capital, land and other problems, strict quality and safety and fair distribution off, completed the construction of affordable housing and start the change room shed 10 million sets of tasks, which, housing has been built, so that tens of millions of residents in housing difficult predicament, and protection of housing construction in innovation and management, etc., explore and create experiences for the “second five” affordable housing construction, off to a good start.
Li Keqiang stressed that affordable housing projects, is the major livelihood projects and development projects. Protect the basic housing needs, is an important duty of governments at all levels, through the construction of affordable housing, to help poor people, low-cost, improve housing conditions for the realization and housing, is eagerly looking forward to the masses. Moreover, this is an effective form of income redistribution, is conducive to narrowing the income gap and promote social harmony and stability. Meanwhile, the protection of housing construction is a major macro-control measures, and expand domestic demand and support the development of urbanization, and promote stable and rapid economic development and stability of general price level, especially in the current grim international economic situation, to be successful coping with complicated situations, next year, to expand domestic demand must be in accordance with the requirements for the strategic basis, firmly and effectively to promote housing and support, play their strong investment and consumption stimulus for economic growth, provide an important impetus.
Li Keqiang said that the solid orderly protection of housing construction, next year (2012 ‘) to arrange the number of new construction, less than this year, but, with carry-over continued construction, under construction, is still great and arduous tasks. Central subsidies, than this year increased significantly, local government should increase investment, but also through loans, issuing corporate bonds, etc., to attract social funds, diversified financing. The protection of housing new construction land, the implementation of a separate, ensure that the sites need to carry out to explore the use of land for construction of public rental collective construction of the pilot. Efforts to further increase the shantytowns. The raising of multi-channel availability in the real estate project, with construction of a certain percentage of the security room, so that different income groups and harmonious co-residence. Government through the purchase of a suitable ordinary housing existing homes, to increase the effective protection of housing supply. Year, to 500 million units built more than basic security room, completion was higher than that this year, so that more poor people to stay as soon as possible. He stressed that the construction of affordable housing is not only to let the people have room to live, but also simultaneous construction and improvement of the necessary water, electricity, roads, gas and other municipal facilities and related facilities for the residents convenience.
Li pointed out that housing is the foundation for the people to pay close attention to quality and safety are not relaxed, built a century homes without wavering. The key is to do the project funds, effective supervision, responsibility in place. To reasonably determine the project budget, to avoid artificially low cost, and impact on quality of the phenomenon. For planning and design, bidding, construction material, construction, completion and acceptance of the whole process of monitoring and accelerating affordable housing project quality, quality of life of building materials and components supply responsibility. For the occurrence of quality problems, a check in the end, public exposure, strict accountability, so that serious quality problems of enterprises in the market did not take shelter of the land.
Next year, new construction of affordable housing and shantytowns housing more than 7 million units
Beijing in December, Minister of Housing and Urban Construction Jiang Weixin, 23, said that next year, the new construction of affordable housing and shantytowns housing more than 7 million units, more than 500 million units basically completed, the completion of the amount is higher than this year.
Jiang Weixin at the meeting of the National Housing and Urban-Rural Construction Work Conference said that next year, will continue to promote construction of affordable housing projects, and strengthen management. Take effective measures to ensure the implementation of capital and land. Strict planning and design, building materials supply, construction and final acceptance as to ensure project quality.
Jiang Weixin, this year the joint efforts of all parties has been completed ahead of schedule to start construction of affordable housing and shantytowns housing 10 million sets of tasks.
Next year, new construction more than 700 million units of affordable housing which signals the release?
– Interview with Ministry of Housing and Urban Construction Policy Research Center Renqin Hong
Beijing December 23, 2012, the new construction of affordable housing and shantytowns housing more than 7 million units, data one, triggering widespread concern.
More than 700 million units of affordable housing construction targets, which signals the release? Department of Housing and Urban Construction Policy Research Center Renqin Hong, 23, answered this question.
Building intensity is not reduced, the actual amount in the huge construction
And 10 million units in 2011 compared to the target building, next year, more than 700 million sets of new construction, decreased. Does this mean that government protection of housing construction weakened it?
Qin Hong said, the number of new construction, though a small, but in 2012, a huge amount of actual construction in progress, the actual investment of construction funds, will be more than this year. Housing construction, there are about 2-3 years construction period, according to rough estimates, next year, the actual amount of construction in progress, there are about 18 million units, including the 2009 part of new construction projects must be completed by next year, 2011 new start of the 10 million units, the vast majority, the next year, to build. Therefore, the protection of housing construction efforts, and not diminished.
According to reports, the plan is based “on-demand reporting, bottom-up” principle, considering the capital, land, and other factors to determine the continued construction of the project, and the railway departments shantytowns into the plan. Requirements of the Department of Housing and Urban Construction, next year, newly started projects, the latest to the end of November, all the work, started in the standard, and this year, same as asking a third, to the main structure basically completed; one-third into the floor construction; third, started foundation construction.
More funds for completion of insurance protection quality assurance support
Upon request, 2012, the basic protection of housing to build more than 500 million units, the completion of the amount is higher than this year. With the construction of affordable housing task increased, quality control and distribution, operation and management is facing severe challenges, especially infrastructure construction tasks, and heavier.
Help balance the “second five” protection of housing construction during the rhythm
According to the plan, “five-second” period, China to build 36 million units of affordable housing. Qin Hong said that next year, is the “second five” in the second year, two years ago, started the construction of more than 17 million units of affordable housing, almost the entire “second five” building half the task. Thus, in 2012, the identification of new construction for more than 7 million units of the security room, you can make the “second five” building rhythm, more balanced.
2011, 10 million sets of arrangements for construction of protection of housing, both to increase the supply of affordable housing as quickly as possible, a little earlier to solve the housing problems of poor people, promote social equity and harmony; also take into account the needs of the real estate market regulation, as soon as completed by a considerable number of affordable housing to ease the housing supply and demand, stable social expectations, while avoiding the substantial decline in real estate investment affect economic development.
Qin Hong said that in 2011, started construction of 10 million units of affordable housing, the release of policy signals, is sufficient to change market expectations, has had a positive effect, greatly slowed in low-income families, housing prices in the face of panic. Therefore, at present, the protection of housing conditions slowed the development pace.
Released 2012 version of the Shanghai map “detailing major urban areas,” covering suburban town center (December 23, 2011)
Compiled by the Shanghai Institute of Surveying and Mapping, 2012 edition of Shanghai Map, officially released. Among them, the new version of the “big city Detailing” coverage from the Pudong International Airport, east, west Qingpu Jiasong road, south Songjiang New City north, Jiading District, with a total area of over 3000 square kilometers, more than covered by the 2011 Transportation Map 1300 square kilometers, an increase of 1700 square kilometers, the Shanghai six affordable housing base in the map, has been marked.
The 2012 released version of the map, which lasted more than two years, design is completed, both the outer regions of covered “public transportation map”, another cover Jiading, Songjiang and other suburban town centers, “big city detail.” “Public transport map” marked all 783 downtown bus lines Termini station, house number on the map greatly increased public transportation, rail transportation and other transfer information is very rich. This map for the first time information on urban and suburban bus interface, to solve public problems last 1 km trip, set up a community shuttle bus, in the chart, has been clearly marked.
In addition to these two maps, mapping the city hospital is stepping up “tourist map”, “drive-specific plans” and other thematic maps of the development work, and the development of Shanghai as soon as the mobile electronic map. The fastest end of next year, members of the public through mobile phones, tablet PCs and other mobile devices, fast access to dynamic traffic information covering map of Shanghai.
In Shopping mall, In 5 Star Hotel, quasi-six-star hotel, the rental place for those who need – China World Hotel (Sichuan cuisine, Chinese cuisine, Shanghai cuisine, Cantonese Department, Guangdong cuisine, Canton cuisine to help), Chinese restaurants, Chinese restaurants , the feasibility of franchising project -500-1000 square meters, 15 cooks, 30 female attendants, three million yuan joint venture projects; Mr.George Chen = Mr.Geoorge S. Chen: 1779642876@qq.com; george13901623260 @ 163 . com; chensihong1961@126.com; QQ: 1779642876;
English, English, automatic translation by Google; Google English; Google in English
Reproduced one: From: http://www.billionairesParty.com http://www.billionairesGroup.com http://www.billionairesdesire.com http://www.helicoptersbuyers.com
Commonwealth Restaurant Management Group, Chairman of the Board comprehensive: Mr.George Chen = Mr.Geoorge S. Chen: 1779642876@qq.com; george13901623260@163.com; chensihong1961@126.com; QQ: 1779642876; my own only accept mobile phone text messages (0086-13901623260); all my business partner, please contact with me every mail; potential purchase of European and American helicopter makers, you must issue a certificate of bank credit; if the purchaser is not more than RMB 3,999,999 large amounts of deposits certificate, do not disturb, thank you famous European and American helicopter purchase, please fill in a form: name, budget, business cards, unit address, phone number, box number, QQ number, purpose, location, flight kilometers requirements, whether private helicopter driving license … http://1779642876.qzone.qq.com
李克強在全國住房保障工作會上強調-紮實做好明年保障性安居工程建設, 確保公開公正公平分配
12月22日,中共中央政治局常委、國務院副總理李克強在北京出席全國住房保障工作會並講話。
北京12月22日,中共中央政治局常委、國務院副總理李克強在全國住房保障工作會上強調,要貫徹落實中央經濟工作會議精神,紮實做好明年住房保障工作,在確保質量的前提下,統籌推進新開工和結轉續建項目建設,完善配套設施,力爭更多竣工,確保分配公平,促進民生改善和經濟發展。
會上,住房和城鄉建設部,北京、黑龍江、江蘇、陝西4省(市)政府負責同志介紹了今年住房保障工作和明年打算及建議。在認真聽取大家的發言後,李克強說,今年,是住房保障工作很不平凡的一年。各地區、各有關部門齊心協力,措施硬、力度大,積極破解資金、土地等難題,嚴把質量安全和分配公平關,完成了開工建設保障房和棚改房1000萬套的任務,其中,已建成的住房,使上千萬困難居民住房解困,並在創新保障房建設和管理模式等方面,探索創造了經驗,為“十二五”保障性安居工程建設,開了個好頭。
李克強強調,保障性安居工程,是重大民生工程和發展工程。保障群眾基本住房需求,是各級政府的重要職責,通過建設保障房,幫助困難群眾,以低成本,改善住房條件,實現住有所居,是群眾的熱切期盼。而且,這也是收入再分配的一種有效形式,有利於縮小收入差距,促進社會和諧穩定。同時,保障房建設,是宏觀調控的重大舉措,有利於擴大內需,支撐城鎮化發展,促進經濟平穩較快發展和物價總水平基本穩定,特別是,在當前嚴峻的國際經濟形勢下,要成功應對複雜局面,明年,必須按照以擴大內需為戰略基點的要求,紮實有效地推進住房保障工作,發揮好其對投資和消費的較強拉動作用,為經濟增長,提供重要動力。
李克強說,為紮實有序推進保障房建設,明年(2012.’)安排的新開工數量,比今年少,但,加上結轉續建,在建規模,仍很大,任務艱鉅。中央補助資金,將比今年明顯增加,各地也要加大政府投入,還要通過貸款支持、發行企業債券等方式,吸引社會資金,多元籌措資金。對保障房新增建設用地指標,實行單列,確保用地需要,開展探索利用集體建設用地建設公租房的試點。進一步加大棚戶區改造力度。多渠道籌集保障房源,在商品房項目中,配建一定比例的保障房,使不同收入群體和諧共居。政府也可通過購買合適的普通商品房現房,來增加保障房有效供應。全年,要基本建成500萬套以上保障房,竣工量要高於今年,使更多困難群眾早日入住。他強調,建設保障房不僅要讓群眾有房住,還要同步建設和完善必要的水、電、路、氣等市政配套與相關服務設施,為居民提供方便。
李克強指出,住房是群眾安身立命之所,要狠抓質量安全不鬆懈,建百年安居不動搖。關鍵是要做到項目資金到位、有效監管到位、責任落實到位。要合理確定項目預算,避免出現人為壓低成本,而影響質量的現象。對規劃設計、招標投標、建築用材、施工建設、竣工驗收全過程監管,加快推進保障性住房工程質量、建材和部件供應質量終身責任制。對出現質量問題的,一查到底,公開曝光,嚴格追究,使出現嚴重質量問題的企業,在市場沒有存身之地。
明年,新開工保障性住房和棚戶區改造住房700萬套以上
北京12月,住房城鄉建設部部長姜偉新23日說,明年,新開工建設保障性住房和棚戶區改造住房700萬套以上,基本建成500萬套以上,竣工量,要高於今年。
姜偉新在舉行的全國住房和城鄉建設工作會議上說,明年,將繼續推進保障性安居工程建設,強化管理工作。採取有效措施,確保資金和土地落實。嚴把規劃設計、建材供應、施工和竣工驗收關,確保工程質量。
姜偉新介紹,今年在各方的共同努力下,已提前超額完成了開工建設保障性住房和棚戶區改造住房1000萬套的任務。
明年,新開工700多萬套保障房釋放哪些信號?
——專訪住房城鄉建設部政策研究中心主任秦虹
北京12月23日,2012年,新開工建設保障性住房和棚戶區改造住房700萬套以上,數據一出,引發社會廣泛關注。
700多萬套保障房的建設目標,釋放出哪些信號?住房城鄉建設部政策研究中心主任秦虹,23日回答了這一問題。
建設力度未減, 實際在建工程量巨大
與2011年1000萬套的建設目標相比,明年,新開工700多萬套,有所降低。這是否意味著政府保障房建設力度減弱呢?
秦虹表示,新開工數量,雖然少了,但是,2012年,實際在建工程量巨大,建設資金的實際投入,將超過今年。房屋建設,有2-3年左右的建設週期,根據粗略估算,明年,實際在建工程量,有1800萬套左右,這包括2009年新開工的部分項目,到明年就要竣工,2011年新開工的1000萬套,絕大多數,到明年,要在建。因此,保障房建設的力度,並沒有減弱。
據介紹,這個計劃,是根據“按需申報、自下而上”原則,綜合考慮了資金、土地、續建項目等因素確定的,並把鐵道等部門棚戶區改造納入了計劃。住房城鄉建設部要求,明年,新開工的項目,最遲要在11月底前,全部開工,開工標準,與今年一樣,同樣是要求三分之一,達到主體結構基本完成;三分之一,進入樓層施工;三分之一,開始基礎施工。
資金更多用於保竣工保質量保配套
根據要求,2012年,保障房要基本建成500萬套以上,竣工量,要高於今年。隨著保障性住房建設任務的加大,工程質量監管以及分配、運營管理面臨嚴峻挑戰,特別是基礎設施配套建設的任務,也越來越重。
有利於均衡“十二五”期間保障房建設節奏
根據規劃,“十二五”期間,中國要建設3600萬套保障房。秦虹表示,明年,是“十二五”的第二年,前兩年,開工建設1700多萬套保障房,幾乎達到整個“十二五”建設任務的一半。因此,2012年,確定新開工建設700萬套以上的保障房,可以使“十二五”期間的建設節奏,更均衡。
2011年,安排開工建設1000萬套保障房,既是為了盡快增加保障性住房供應,早一點解決困難群眾的住房問題,促進社會公平與和諧;也考慮到房地產市場調控的需要,通過盡快建成相當數量的保障性住房,緩解住房供需矛盾,穩定社會預期,同時避免房地產投資大幅下降而影響經濟發展。
秦虹表示,2011年,開工建設1000萬套保障房,釋放出的政策信號,十分充分,對改變市場預期,已產生了積極作用,大大減緩了中,低收入家庭,面對房價過快上漲的恐慌心理。因此,目前,有條件放緩保障房的開發節奏。
2012版上海地圖出爐《 大城區詳圖》覆蓋郊區中心城鎮( 2011年12月23日 )
由上海市測繪院編制的,2012版上海地圖,正式發布。其中,新版的《 大城區詳圖》覆蓋範圍,東起浦東國際機場、西至青浦嘉松公路、南臨松江新城、北抵嘉定城區,總面積超過3000平方公里,比2011版交通圖覆蓋的1300平方公里,增加了1700平方公里,上海六大保障性住房基地,都在圖上,得到了標示。
此次出爐的2012版地圖,歷時2年多,設計完成,既有覆蓋外環區域的《 公共交通圖》,又有覆蓋嘉定、松江等郊區中心城鎮的《 大城區詳圖》。 《 公共交通圖》標明了中心城區所有783條公交線路的起訖站,圖上的門牌號碼大大增加,公交、軌道交通等各種換乘信息非常豐富。這張地圖首次實現了市區與城郊公交信息的銜接,為解決市民最後1公里出行問題,設置的社區穿梭巴士,在圖上,得到了清晰的標示。
除了這兩份地圖,市測繪院正在抓緊《 旅遊觀光圖》、《 駕車專用圖》等專題地圖的研製工作,並將盡快開發出上海的移動電子地圖。最快明年年底,市民就可以通過手機、平板電腦等移動設備,快速獲取涵蓋動態交通信息的上海地圖。
In Shopping mall ,In 5 Star Hotel ,準六星大酒店內,租賃場所需要者-中國大飯店(四川菜系,中國菜系,上海菜系,粵菜系,廣東菜系,廣幫菜系),中國餐廳,中國餐館,連鎖加盟可行性項目-500-1000平方米,15位廚師,30位女性服務員,300萬元人民幣合資項目;Mr.George Chen = Mr.Geoorge S. Chen : 1779642876@qq.com ; george13901623260@163 .com ; chensihong1961@126.com ; QQ: 1779642876 ;
英語,英文,由谷歌自動翻譯;谷歌英語;谷歌英文
轉載人:From: http://www.billionairesParty.com http://www.billionairesGroup.com http://www.billionairesdesire.com http://www.helicoptersbuyers.com
英聯邦中餐館經營管理綜合集團公司董事局主席:Mr.George Chen = Mr.Geoorge S. Chen : 1779642876@qq.com ; george13901623260@163.com ; chensihong1961@126.com ; QQ: 1779642876 ;我自己的,只接受短信的手機(0086-13901623260); 我的一切生意夥伴,請與我的各個郵箱聯繫;潛在購買歐美品牌直升機者們,請你務必出具銀行資信證明書;如果購買者沒有RMB 3,999,999以上巨額存款證明書者,請勿打擾,謝謝歐美名牌直升飛機購買者請填表:姓名,預算額,名片,單位網址,手機號碼,郵箱號碼,QQ號碼,用途,使用地點,飛行公里要求,有否直升機駕駛私照… http://1779642876.qzone.qq.com